When Giant Tiger determined that an existing loading dock lift table had deteriorated beyond repair, they turned to Wellington Dock & Door Ltd. to provide a complete replacement solution.
Our team managed the project from start to finish, safely removing the failed lift table and installing a new Metro Dock lift table designed to provide reliable, long-term performance. To ensure a seamless installation, our in-house electrical division completed all power and control wiring, delivering a fully turnkey solution.
By handling both the mechanical installation and electrical work, Wellington Dock & Door minimized downtime and simplified the project for the customer. The new lift table restored safe, efficient loading dock operations and provided Giant Tiger with a dependable solution backed by a single contractor from demolition through commissioning.

Wellington Electrical Services, our in-house electrical division, completed all aspects of the electrical work for the lift table replacement. The team safely decommissioned the existing equipment, removed the obsolete electrical connections, installed new power and control wiring, and completed the commissioning of the new Metro Dock lift table.
By utilizing our own licensed electricians, we were able to coordinate the electrical and mechanical work seamlessly, reducing downtime, maintaining project schedules, and delivering a true turnkey installation. This integrated approach ensured the new lift table was installed, tested, and fully operational, providing the customer with a safe and reliable loading dock solution.